Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Sep 9 21:39:07 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6116528
Posted: Jul 06 (19:34)

No Responses Yet
Rail News
1467 views
0

IR Affairs
SWR/South Western
Jul 06 (19:34)   Railway Underbridge Approved, Boosting Connectivity Between Mysuru and Magadi Road

Exynos9611~   18881 news posts
Entry# 6116528   News Entry# 559197         Tags   Past Edits
Mysore-Magadi road to get vital railway underbridge

The Railway Department has approved the construction of a railway underbridge (RUB) near Challaghatta, connecting Magadi Road and Mysore Road. This project, initially requested by the Bangalore Development Authority (BDA) in 2019, faced delays due to COVID-19 and land acquisition issues. Estimated at ₹39 crore, the RUB will be a vital...
more...
link between the two roads, easing traffic congestion. The BDA will begin construction on the underbridge soon. A private company has secured the tender for the RUB, adding to their ongoing work on the Major Arterial Road (MAR). This RUB will connect to the Metro line under construction by BMRCL and will span four lanes. The MAR project, facing delays due to land acquisition issues, is expected to be completed soon. The RUB between Kenchenahalli and Hejjala railway stations will connect the Metro line to the two roads. The MAR project, spanning 10.75 km and costing ₹450 crore, is underway. This road will be 100 meters wide with 8 lanes, connecting all 9 blocks of Nadaprabhu Kempegowda Layout and providing access to Magadi Road and Mysore Road. The project includes three underpasses, 35 small bridges, and the railway underbridge. Once completed, the MAR project will significantly reduce traffic congestion by linking the two roads. The approval of the RUB will enhance connectivity between Mysuru and Magadi Road, benefiting commuters and real estate prospects in the area.

Railway Department ne Challaghatta ke paas ek railway underbridge (RUB) banane ki approval de di hai, jo Magadi Road aur Mysore Road ko connect karega. Ye project, jo 2019 mein Bangalore Development Authority (BDA) ne maanga tha, COVID-19 aur land acquisition issues ke wajah se delay ho gaya tha. ₹39 crore...
more...
ke budget ke saath, yeh RUB dono roads ke beech ek important link hoga aur traffic jam ko kam karega. BDA abhi underbridge ki construction start karne wala hai. Ek private company ne RUB banane ka tender le liya hai, jo Major Arterial Road (MAR) par unka ongoing work ka part hai. Yeh RUB BMRCL dwara banaye ja rahe Metro line se connect hoga aur four lanes ka hoga. MAR project, land acquisition ke legal issues ke wajah se delay ho raha hai, par BDA officials ne confirm kiya hai ki ye project jaldi hi complete ho jaayega. Unhone bataya ki legal matters almost resolve ho gaye hain aur resolve hone ke baad, remaining road work jaldi se start ho jaayega. Kenchenahalli aur Hejjala railway stations ke beech banaaya ja raha RUB, Metro line ko dono roads se connect karega. MAR project, jo 10.75 km lamba hai aur ₹450 crore ka budget hai, chal raha hai. Ye road 100 meters wide aur 8 lanes ka hoga, jo Nadaprabhu Kempegowda Layout ke 9 blocks ko connect karega aur Magadi Road aur Mysore Road tak access dega. Project mein three underpasses, 35 small bridges, aur ek railway underbridge bhi include hai. Project complete hone ke baad, MAR project dono roads ko connect karke traffic jam ko kam karega. RUB ki approval se Mysuru aur Magadi Road ke beech connectivity improve hogi, jisse commuters aur area mein real estate prospects ko fayda hoga.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy