If this VB is to be run with this TT then its pretty useless. Actually SCR had proposed the following TT :
Jalna 05:30
CST 11:00
CST 13:30
Jalna...
more... 19:30
Which looked reasonable.
1. Travel Time beyond 6 hrs 15 mins for this VB is not acceptable
2. Departure from Mumbai at 13:10 looks good provided arrival time is around 19:15 hrs at Jalna but then J JS TT needs to be revised. Departure time 13:10 considering non availability of departure slots in Mumbai Division especially running path availability between CSMT - VVH.
3. Extension till NED is desired post completion of Electrification works between J and NED. An 8 hr 15 mins TT will work wonders. (ANyone having timeline status of the E.works may please advise to gauge the extension date.