Complete Poles are now there from Panvel till nagathone (based on your input :P) and from Pen till Thal Siding. Now onlt wiring and construction of substation (wherever they are) is left
there i something coming up shortly before Pen, but it seems too small to be a traction substation, is most probably SSP rather than a full fledged substation. No idea from where the power will be fed from, though I believe Antora substation and Apta Substations of MSEDCL would be used.