Train is getting good occupancy despite having a clone slot after Rewanchal. Rewa-Sgrl line k complete hone par isko Singrauli tak extend kr sakte h wese bhi RSA Singrauli wali train k saath h. Eventually frequency increase krke BPL-SGRL 4 days via REWA 3 days via NKJ chalana chaahie same SGRL-NZM 3 days via NKJ 4 days via REWA chalana chaahie. 4 LHB rake k saath.
And for Required connections 1st time any Bhopal's MP is doing some efforts. RKMP-LKO/LJN VB is final and can be started in October also BPL-PNBE...
more...
BPL-MUMBAI SL VB is in pipeline.
We are also demanding BPL-ADI VB and BPL-PUNE SL VB.
please wait...Translate to EnglishTrain's getting packed even with a clone slot after Rewanchal. Once the Rewa-Sgrl line is done, we can stretch it to Singrauli since it's got the RSA Singrauli train with it. We should pump up the frequency to BPL-SGRL 4 days via REWA and 3 days via NKJ, same for SGRL-NZM 3 days via NKJ and 4 days via REWA. With 4 LHB rakes.
And about the needed connections, first time any MP from Bhopal’s doing something. RKMP-LKO/LJN VB is set and can start in October too, BPL-PNBE.
BPL-MUMBAI SL VB is in the works.
We're also pushing for BPL-ADI VB and BPL-PUNE SL VB.