Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sun Sep 8 00:47:54 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
no description available
Entry# 5789174-0

KARI/Khari (Arpinchala) (1 PFs)
खड़ी
کھڑی

Track: Single Electric-Line

Updated: Feb 05 (08:45) by Melanomia~

Station Address

Village Khari, District - Ramban - 182145
State: Jammu and Kashmir

Elevation: 1560 m above sea level
Type: Regular   Category: NSG-6
Zone: NR/Northern   Division: Firozpur


No Recent News for KARI/Khari (Arpinchala)
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 4
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 5.0/5 (3 votes)
cleanliness - excellent (1)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - excellent (1)
sightseeing - excellent (1)
safety - n/a (0)

Station News

Page#    Showing 1 to 9 of 9 News Items  
Feb 19 (08:37) High-Speed Test Conducted on Sangaldan-Khari Section of USBRL Project (www.hindustantimes.com)
New Facilities/Technology
NR/Northern
14445 views
0

News Entry# 541951   
  Past Edits
Feb 19 2024 (08:37)
Station Tag: Sumber/SUMBER added by karbang~/50057

Feb 19 2024 (08:37)
Station Tag: Khari (Arpinchala)/NCLNA added by karbang~/50057

Feb 19 2024 (08:37)
Station Tag: Sangaldan/SNGDN added by karbang~/50057
read full article... Kashmir rail project: High-speed electric train blitzes on Sangaldan-Khari track for trial run

The Commissioner of Railway Safety (CRS) Dinesh Chand Deshwal conducted a two-day inspection of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project in Jammu and Kashmir. The inspection included a trolley trial run and a high-speed test on the Khari-Sumber-Sangaldan track. On the first day, the CRS inspected the 15-km Khari-Sumber track and...
more...
on the second day, he inspected the 19-km Sangaldan-Sumber track, followed by a high-speed test on the Sangaldan-Khari section. The CRS also inspected the track between Katra and Banihal on the first day. After the inspection, he left for Srinagar to attend a meeting with USBRL officials. It is anticipated that Prime Minister Narendra Modi may virtually inaugurate the Chenab Rail Bridge and some sections of the USBRL project soon.

Commissioner of Railway Safety (CRS) Dinesh Chand Deshwal ne Jammu and Kashmir me Udhampur-Srinagar-Baramulla Rail Link (USBRL) project ka do din ka inspection kiya. Is inspection me Khari-Sumber-Sangaldan track par trolley trial run aur high-speed test shamil tha. Pehle din, CRS ne 15-km Khari-Sumber track ka inspection kiya aur dusre din,...
more...
unhone 19-km Sangaldan-Sumber track ka inspection kiya, jiske baad Sangaldan-Khari section par high-speed test kiya gaya. CRS ne pehle din Katra aur Banihal ke beech ka track bhi inspect kiya. Inspection ke baad, woh Srinagar gaye, jahaan unhone USBRL officials ke saath meeting attend ki. Aisa mana ja raha hai ki Prime Minister Narendra Modi jaldi hi Chenab Rail Bridge aur USBRL project ke kuchh section ka virtual inauguration kar sakte hain.
Feb 17 (17:43) Indian Railways to Launch Train Services on Banihal-Sangaldan Section of USBRL Project (www.dailyexcelsior.com)
New Facilities/Technology
NR/Northern
53787 views
4

News Entry# 541707   
  Past Edits
Feb 17 2024 (17:44)
Station Tag: Salmari/SRI removed by /2218862

Feb 17 2024 (17:44)
Station Tag: Qazigund/QG added by genius^~/2218862

Feb 17 2024 (17:44)
Station Tag: Baramula/BRML added by genius^~/2218862

Feb 17 2024 (17:44)
Station Tag: Srinagar Kashmir/SINA added by genius^~/2218862

Feb 17 2024 (17:44)
Station Tag: Salmari/SRI added by genius^~/2218862

Feb 17 2024 (17:44)
Station Tag: MCTM Udhampur/MCTM added by genius^~/2218862

Feb 17 2024 (17:44)
Station Tag: Sangaldan/SNGDN added by genius^~/2218862

Feb 17 2024 (17:44)
Station Tag: Khari (Arpinchala)/NCLNA added by genius^~/2218862

Feb 17 2024 (17:44)
Station Tag: Sumber/SUMBER added by genius^~/2218862

Feb 17 2024 (17:44)
Station Tag: Banihal/BAHL added by genius^~/2218862

Feb 17 2024 (17:44)
Station Tag: Jammu Tawi/JAT added by genius^~/2218862
read full article... Banihal-Sangaldan Section Of Udhampur-Srinagar-Baramulla Rail Link To Open On February 20

The Indian Railways is set to launch train services on the 48.1-kilometer Banihal-Khari-Sumber-Sangaldan section of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project on February 20th. Prime Minister Narendra Modi is expected to virtually inaugurate the section by flagging off a train from Sangaldan. The USBRL project, spanning 272 kilometers, aims to connect...
more...
the Kashmir Valley with Jammu and the national rail network. This section, constructed at a cost of Rs 15,863 crore, features 16 bridges, 11 tunnels, and advanced safety features like ballastless tracks and canted turnouts. Electrification of the Baramulla-Srinagar-Banihal-Sangaldan section is complete, allowing for the operation of Vande Bharat trains. The project includes 19 railway stations and boasts specialized equipment for high-altitude operations.

Indian Railways 20 February ko Banihal-Khari-Sumber-Sangaldan section pe train service shuru karne wala hai, yeh 48.1 kilometer lamba section hai aur Udhampur-Srinagar-Baramulla Rail Link (USBRL) project ka ek important part hai. Prime Minister Narendra Modi Sangaldan se train ko virtually flag off karenge, is section ka inauguration karne ke liye. USBRL...
more...
project 272 kilometer lamba hai aur iska aim Kashmir Valley ko Jammu aur national rail network se connect karna hai. Yeh section 15,863 crore rupees mein banaya gaya hai, isme 16 bridges, 11 tunnels hain aur isme advanced safety features bhi hain jaise ki ballastless tracks aur canted turnouts. Baramulla-Srinagar-Banihal-Sangaldan section ka electrification complete ho chuka hai, jisse Vande Bharat trains chalane ke liye rasta clear ho gaya hai. Is project mein 19 railway stations hain aur high-altitude operations ke liye specialized equipment bhi hai.
Jan 15 (01:47) CRS Conducts Second Inspection of Banihal-Khari Track on USBRL Project (www.financialexpress.com)
IR Affairs
NR/Northern
28262 views
2

News Entry# 537561   
  Past Edits
Jan 15 2024 (01:49)
Station Tag: MCTM Udhampur/MCTM added by Abhijay2407/349977

Jan 15 2024 (01:49)
Station Tag: SMVD Katra/SVDK added by Abhijay2407/349977

Jan 15 2024 (01:49)
Station Tag: Reasi/REASI added by Abhijay2407/349977

Jan 15 2024 (01:48)
Station Tag: Baramula/BRML added by Abhijay2407/349977

Jan 15 2024 (01:48)
Station Tag: Srinagar Kashmir/SINA added by Abhijay2407/349977

Jan 15 2024 (01:47)
Station Tag: Banihal/BAHL added by Abhijay2407/349977

Jan 15 2024 (01:47)
Station Tag: Khari (Arpinchala)/NCLNA added by Abhijay2407/349977
read full article... Udhampur-Srinagar-Baramulla Rail Link Project:  CRS conducts second inspection on Banihal-Khari section, says ‘infrastructure ready for commissioning’

On January 3rd, the Commissioner of Railway Safety (CRS) conducted the second round of inspections for the 14.869 km track between Banihal and Khari, part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project. This inspection is a statutory requirement for the newly completed track.

3 January ko, Commissioner of Railway Safety (CRS) ne Udhampur-Srinagar-Baramulla Rail Link (USBRL) project ke Banihal aur Khari ke beech ke 14.869 km track pe doosra round ka inspection kiya. Ye inspection newly completed track ke liye statutory requirement hai.
Jan 04 (18:50) High Speed Train Test Conducted on Udhampur Baramulla Railway Line (kashmirlife.net)
IR Affairs
NR/Northern
28346 views
1

News Entry# 536255   
  Past Edits
Jan 04 2024 (18:51)
Station Tag: Khari (Arpinchala)/NCLNA added by AdittyaaSharma^~/1421836

Jan 04 2024 (18:50)
Station Tag: Reasi/REASI added by AdittyaaSharma^~/1421836

Jan 04 2024 (18:50)
Station Tag: Srinagar Kashmir/SINA added by AdittyaaSharma^~/1421836

Jan 04 2024 (18:50)
Station Tag: Banihal/BAHL added by AdittyaaSharma^~/1421836

Jan 04 2024 (18:50)
Station Tag: Baramula/BRML added by AdittyaaSharma^~/1421836

Jan 04 2024 (18:50)
Station Tag: MCTM Udhampur/MCTM added by AdittyaaSharma^~/1421836
SRINAGAR: The Commissioner of Railway Safety (CRS), Dinesh Chand Deshwal, conducted an inspection of the 14.869 km Banihal-Khari rail track, a segment of the Udhampur-Srinagar-Baramulla rail...
read full article... High Speed Train Test Conducted on Udhampur Baramulla Railway Line
Dec 31 2023 (17:59) USBRL Project Progress: Banihal-Khari Rail Section Ready for Operations (kashmirlife.net)
IR Affairs
NR/Northern
13167 views
0

News Entry# 535779   
  Past Edits
This is a new feature showing past edits to this News Post.
In a significant milestone for railway connectivity, the newly constructed line spanning 14.869 kilometers in the Banihal-Khari section of Firozpur Division is set to be inaugurated....
read full article... USBRL Project Progress: Banihal-Khari Rail Section Ready for Operations
Page#    Showing 1 to 9 of 9 News Items  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy