Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sat Sep 7 13:25:46 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

SWD/Sanawad (3 PFs)
सनावद
سناود

Track: Construction - Single-Line Electrification

Station Address

SH 27, Sanawad, District - West Nimar (Khargone), Pin 451111
State: Madhya Pradesh

Elevation: n/a
Type: Regular   Category: n/a
Zone: WR/Western   Division: Ratlam


No Recent News for SWD/Sanawad
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 0
Number of Originating Trains: 1
Number of Terminating Trains: 1
0 Follows
Rating: 5.0/5 (16 votes)
cleanliness - excellent (2)
porters/escalators - excellent (2)
food - excellent (2)
transportation - excellent (2)
lodging - excellent (2)
railfanning - excellent (2)
sightseeing - excellent (2)
safety - excellent (2)

Station News

Page#    Showing 21 to 40 of 138 News Items  <<prev  next>>
May 24 (20:26) Mhow-Sanawad Broad Gauge Line Project Nears Completion, With New Alignment and Multiple Stations (www.naidunia.com)
IR Affairs
WR/Western
11406 views
1

News Entry# 553524   
  Past Edits
May 24 2024 (20:51)
Station Tag: Sanawad/SWD added by AdittyaaSharma^~/1421836

May 24 2024 (20:51)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by AdittyaaSharma^~/1421836
read full article... Indore Khandwa Rail Line: इंदौर-खंडवा प्रोजेक्ट में 231 करोड़ रुपए में बनेगी 21 किमी की नई रेल लाइन,

The Western Railway's Ratlam-Indore-Mhow-Sanawad-Khandwa broad gauge line project is nearing completion. A 71 km stretch between Mhow and Sanawad is currently being converted from meter gauge to broad gauge. This section will be completed in two phases: Mhow-Balwada and Balwada-Sanawad. The new alignment of the track will divert from Patalpani and...
more...
pass through Badiya, Beka, Kulthana, and Rajpura, eventually reaching Choral. Stations will be built at all these locations, including a new station at Choral. The project involves the construction of 21 tunnels, 36 major bridges, 76 minor bridges, 12 under bridges, and over bridges. The longest tunnel, measuring 4.1 km, is already under construction. The total project cost is estimated at ₹910 crores, with ₹231 crores allocated for the Balwada-Sanawad section. The project is expected to be completed by 2026. The tenders for the remaining sections of the project will be opened by June 10th, with construction expected to begin in September.

Western Railway ka Ratlam-Indore-Mhow-Sanawad-Khandwa broad gauge line project almost complete ho gaya hai. Mhow aur Sanawad ke beech 71 km ka stretch abhi bhi meter gauge hai, jisko broad gauge mein convert kiya ja raha hai. Ye section do phases mein complete hoga: Mhow-Balwada aur Balwada-Sanawad. Track ka new alignment Patalpani...
more...
se divert hoga aur Badiya, Beka, Kulthana, aur Rajpura se hota hua Choral tak jaayega. In sabhi jagah par stations banaye jaayenge, Choral mein bhi ek new station banega. Project mein 21 tunnels, 36 major bridges, 76 minor bridges, 12 under bridges, aur over bridges banaye jaayenge. Sabse lambi tunnel, 4.1 km lambi, already under construction hai. Project ki total cost ₹910 crores hai, jismein ₹231 crores Balwada-Sanawad section ke liye allocate kiya gaya hai. Project 2026 tak complete hone ki ummid hai. Project ke remaining sections ke liye tenders June 10th tak open honge, aur September mein construction shuru hone ki ummid hai.
read full article... Indore Railway Station: इंदौर में रेलवे स्टेशन पर तेजी से बढ़ रहा दबाव, बढ़ानी होगी संख्या, विभाग के पास कोई योजना नहीं

Indore's railway station is facing increasing pressure due to rising passenger numbers and new rail routes. While the government plans to invest 494 crores to revamp the current station, there's no clear plan for expanding capacity. Several new rail projects are underway, including Indore-Dahod, Indore-Budhni, Indore-Mahou-Khandwa, and Indore-Manmad, which will significantly...
more...
increase train frequency. A new, large railway station has been proposed in Kumedhi to accommodate the expected increase in train traffic. There's also a suggestion to relocate goods storage from Lakshmibai Nagar station to create space for additional platforms, and to utilize the Rajendra Nagar station for station return trains to ease congestion at the main station.

Indore ka railway station bahut zyada pressure mein hai, kyunki log zyada train se travel kar rahe hain aur new routes bhi aa rahe hain. Sarkar ne 494 crore rupees deke current station ko revamp karne ki plan banayi hai, but koi clear plan nahi hai station ko expand karne ka....
more...
Kafi saare new rail projects chal rahe hain, jaise Indore-Dahod, Indore-Budhni, Indore-Mahou-Khandwa, and Indore-Manmad, jisse bahut zyada trains chalengi. Kumedhi mein ek new, bada railway station banane ka plan hai, taaki trains ki badhti hui number ko manage kiya ja sake. Lakshmibai Nagar station se goods storage ko shift karne ka bhi suggestion hai, taaki extra platforms banaye ja sake, aur Rajendra Nagar station ko station return trains chalaane ke liye use kiya ja sake, taaki main station par crowd kam ho.

Rail News
66935 views
2

Apr 16 (22:04)
ItsDtherailfan~
ItsDtherailfan~   126 blog posts
Re# 6031171-1              
Running express of every station will reduce its importance
In case of Indore LMNR & INDB be terminal and DADN be a far terminal and all trains from DADN including express & superfast must be given halt at Rajendra Nagar and should not stop at Indore main junction, it will reduce congestion
Translate to English
Translate to Hindi
Mar 26 (10:57) Indore-Khandwa Rail Line Project Takes Significant Steps Forward: 7.5 km Section Tendered, New Stations & Bridges Planned (www.naidunia.com)
IR Affairs
WR/Western
35146 views
0

News Entry# 546163   
  Past Edits
Mar 26 2024 (10:57)
Station Tag: Ratlam Junction/RTM added by AdittyaaSharma^~/1421836

Mar 26 2024 (10:57)
Station Tag: Sanawad/SWD added by AdittyaaSharma^~/1421836

Mar 26 2024 (10:57)
Station Tag: Patal Pani/PTP added by AdittyaaSharma^~/1421836

Mar 26 2024 (10:57)
Station Tag: Dr. Ambedkar Nagar (Mhow)/DADN added by AdittyaaSharma^~/1421836

Mar 26 2024 (10:57)
Station Tag: Khandwa Junction/KNW added by AdittyaaSharma^~/1421836

Mar 26 2024 (10:57)
Station Tag: Indore Junction/INDB added by AdittyaaSharma^~/1421836
read full article... Indore Khandwa Rail Line: ट्रैक पर आने लगा महू-सनावद ब्राडगेज लाइन प्राेजेक्ट

The Indore-Khandwa broad gauge rail line project, a long-awaited project, is progressing steadily. The Ratlam division has recently tendered for the construction of a 7.5 km stretch from Patalpani to the Portal-1 of the Beka Tunnel. This stretch includes 30 bridges and is expected to be completed within 15 months. ...
more...
The new alignment of the track will diverge from Patalpani and pass through Bedia, Beka, Kulthana, Rajpura, and Choral, with new stations being constructed at each location. A new station is also being built in Choral. The existing line will be connected to the old meter gauge line about 6 km before Mukhtyarabardwala. The project includes 21 tunnels, 36 major bridges, 76 minor bridges, 12 underpasses, and overpasses. The project is divided into two parts, Mahu-Balwada and Balwada-Barwaha. Construction work is also underway on a new broad gauge bridge over the Narmada River at Mortakka, replacing the old bridge. The construction of an ROB will also be carried out at the Patalpani waterfall. The Patalpani to Portal-1 section, which includes hilly terrain, will require several bridges. A 200-meter long bridge will be constructed over the Mehndi Kund tourist spot, resting on pillars. The project is being undertaken in phases to ensure timely completion. The tender for the 7.5 km section between Patalpani and the tunnel has been awarded.

Indore-Khandwa broad gauge rail line project, ek bahut purana project, aage badh raha hai. Ratlam division ne recently Patalpani se Beka Tunnel ke Portal-1 tak 7.5 km ke stretch ka construction ka tender nikala hai. Is stretch me 30 bridges hai aur ye 15 mahine mein complete hone ki ummeed hai....
more...
Track ka new alignment Patalpani se diverge hoga aur Bedia, Beka, Kulthana, Rajpura aur Choral se hota hua jaayega, aur har jagah pe new stations ban rahe hain. Choral me bhi ek new station bana raha hai. Existing line ko Mukhtyarabardwala se 6 km pehle purani meter gauge line se connect kiya jaayega. Is project me 21 tunnels, 36 major bridges, 76 minor bridges, 12 underpasses aur overpasses banaye jaayenge. Project ko do parts me divide kiya gaya hai, Mahu-Balwada aur Balwada-Barwaha. Mortakka pe Narmada River par new broad gauge bridge ka construction kaam bhi start ho gaya hai, jisme purana bridge todke new pillars laga diye jaayenge. Patalpani waterfall pe ROB bhi banaya jaayega. Patalpani se Portal-1 tak, jisme hilly terrain hai, bahut saare bridges banaye jaayenge. Mehndi Kund tourist spot par 200-meter lamba bridge banaya jaayega, jo pillars par khade hoga. Project ko phase-wise karke complete kiya ja raha hai, taaki time pe complete ho sake. Patalpani aur tunnel ke beech 7.5 km section ka tender award kiya gaya hai.
Mar 21 (14:05) Indore-Khandwa Rail Line Conversion Progress: Bridge Construction Underway (www.naidunia.com)
IR Affairs
WR/Western
25251 views
0

News Entry# 545748   
  Past Edits
This is a new feature showing past edits to this News Post.
read full article... Indore Khandwa Rail Line: इंदौर खंडवा ब्राडगेज पर आकार लेने लगा 900 मीटर लंबा रेलवे ब्रिज

The final section of the Ratlam-Fatehabad-Indore-Mhow-Khandwa broad gauge project, the Mhow-Sanawad meter gauge line, is being converted to broad gauge. A new broad gauge line is being laid between Mhow and Sanawad, including a 900-meter long bridge over the Narmada River at Mortakka. The old bridge has been demolished and...
more...
a new one is being constructed with 16 pillars up to 35 meters high. The bridge is expected to be completed by December 2024. The Sanawad-Barwah rail line will also be converted to broad gauge by then, allowing for broad gauge train operations between Barwah and Khandwa.

Ratlam-Fatehabad-Indore-Mhow-Khandwa broad gauge project ka aakhri section, Mhow-Sanawad meter gauge line, ko broad gauge mein convert kiya ja raha hai. Mhow aur Sanawad ke beech ek new broad gauge line layi ja rahi hai, jismein Mortakka mein Narmada River pe 900 meter lamba bridge bhi banaaya ja raha hai. Purana bridge...
more...
demolish kar diya gaya hai aur ek new bridge 16 pillars ke saath banaaya ja raha hai, jinki maximum height 35 meter tak hogi. Bridge December 2024 tak complete hone ki ummeed hai. Tab tak Sanawad-Barwah rail line bhi broad gauge ho jaayega, jisse Barwah se Khandwa tak broad gauge line pe train chalna shuru ho jaayega.
Mar 13 (10:52) New ओंकारेश्वर Road Station Under Construction, Completion Expected by December 2023 (www.naidunia.com)
IR Affairs
WR/Western
22567 views
0

News Entry# 545005   
  Past Edits
Mar 13 2024 (10:54)
Station Tag: Ratlam Junction/RTM added by AdittyaaSharma^~/1421836
read full article... Indian Railways: ओंकारेश्वर मंदिर की तरह दिखेगा नया रेलवे स्टेशन, स्टेशन भवन का 30 फीसद हुआ कार्य

A new ओंकारेश्वर Road station is being built near the ओंकारेश्वर Jyotirling temple, aiming to provide modern amenities and a spiritual ambiance for devotees and tourists. Construction is expected to be completed by December 2023. The station features two platforms, three rail lines, an underpass for station entrance, and another underpass...
more...
connecting the platforms. It will also include parking, retiring rooms, waiting areas, and artwork showcasing the local heritage. The station is being built on a new track between the existing ओंकारेश्वर Road station and Sanavad, which will feature 12 bridges (10 already completed) and drainage systems. An underpass is also being constructed at Railway Crossing 274 at Mortakka to ease traffic congestion. The construction is expected to be completed by December 2023 and will offer a new transportation option for visitors to the ओंकारेश्वर Jyotirling temple. The existing Mahu-ओंकारेश्वर Road station was closed on February 1, 2023, and the new station is located about 1.3 kilometers from the existing station towards Sanavad. The MEMU train service, currently operational between Sanavad and Khandwa, will be extended to the new station, allowing devotees from Maharashtra to reach the temple by train.

Omkareshwar Jyotirling temple ke liye aane waale devotees aur tourists ke liye, ek naya Omkareshwar Road station ban raha hai, jisme aadhunik facilities aur spiritual environment hoga. December 2023 tak is station ko complete karne ka target hai. Station mein do platforms, three rail lines, station entrance ke liye underpass, aur...
more...
platforms ko connect karne ke liye ek aur underpass hai. Parking, retiring rooms, waiting areas aur local heritage ki paintings bhi hongee. Station ko existing Omkareshwar Road station aur Sanavad ke beech banaye jaa rahe ek new track par banaya jaa raha hai, jisme 12 bridges (10 already complete) aur drainage system ban rahe hain. Mortakka par Railway Crossing 274 par traffic jam ko reduce karne ke liye ek underpass bhi banaya jaa raha hai. December 2023 tak construction complete hone ki ummeed hai aur ye Omkareshwar Jyotirling temple aane waale visitors ke liye ek new transport option hoga. Existing Mahu-Omkareshwar Road station ko 1 February 2023 ko close kar diya gaya tha, aur naya station existing station se Sanavad ki taraf 1.3 kilometers door hai. Sanavad aur Khandwa ke beech chalne wali MEMU train service ko naye station tak extend kiya jaayega, jisse Maharashtra se aane waale devotees train se temple tak pahunch sakenge.
Page#    Showing 21 to 40 of 138 News Items  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy