Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 16:45:44 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 828580-0
no description available
Entry# 6005710-0

KQS/Kailaras (1 PFs)
कैलारस

Track: Single Electric-Line

Updated: Mar 22 (13:34)

Station Address

SH 2, Kailaras, District: Morena. Pincode: 476224
State: Madhya Pradesh

Elevation: n/a
Type: Regular   Category: NSG-6
Zone: NCR/North Central   Division: VGL Jhansi


No Recent News for KQS/Kailaras
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)

Station Forum

Page#    Showing 6 to 10 of 29 blog entries  <<prev  next>>
General Travel
22579 views
1

Mar 22 (13:26)   KQS/Kailaras (1 PFs)
RAMCO.
RAMCO.   369 blog posts
Entry# 6005710            Tags  
KQS (NCR)
Translate to English
Translate to Hindi
Rail News
42352 views
1

Temporary Stops
NCR/North Central
Feb 26 (18:07)   Modernization and Beautification of Morena Railway Station Begins with ₹20.36 Crore Redevelopment Project

AdittyaaSharma^~   73037 news posts
Entry# 5979618   News Entry# 542949         Tags   Past Edits
read full article... Morena News: मुरैना में भी रुकेगी समता एक्सप्रेस, रेलवे स्टेशन के भवन का होगा नया निर्माण

On Monday, the foundation stone for the redevelopment and beautification of the Morena railway station was laid at a cost of ₹20.36 crore. The event was attended by Assembly Speaker Narendra Singh Tomar, ADRM Jhansi Vivek Mishra, and Senior DE Satish Niranjan. The redevelopment includes a new station building, improved circulating...
more...
area, green spaces, accessible facilities for people with disabilities, passenger platform shelters, platform surface improvements, drainage development, parking area development, utility centers, pay-and-use toilets, passenger shed expansion, signage, toilets, baggage scanners, metal detectors, coach guidance boards, train indicators, and other modern passenger amenities. The station's interior will be beautified and developed incorporating local art and cultural elements. The project also includes a high-level platform and improved access roads. Prime Minister Narendra Modi virtually inaugurated the redevelopment of 554 railway stations, including Morena, along with the laying of foundation stones for 1500 ROB and RUB projects. The Assembly Speaker announced that the Samata Express train will now stop at Morena station starting this week, fulfilling a long-standing demand from the people of Morena. He also said that the railway facilities in Morena will be upgraded at a cost exceeding ₹20 crore. The train service between Gwalior and Kailaras will be operational by next month, and the goal is to extend the Gwalior railway line to Sheopur this year.

Monday ko Morena railway station ka redevelopment aur beautification ka kaam shuru hone wala hai, jiska kharch ₹20.36 crore hai. Is event mein Assembly Speaker Narendra Singh Tomar, ADRM Jhansi Vivek Mishra, aur Senior DE Satish Niranjan maujud the. Is redevelopment mein new station building, improved circulating area, green spaces, disabled...
more...
logon ke liye facilities, passenger platform shelters, platform surface improvements, drainage development, parking area development, utility centers, pay-and-use toilets, passenger shed expansion, signage, toilets, baggage scanners, metal detectors, coach guidance boards, train indicators, aur dusre modern passenger amenities shamil hain. Station ke andar local art aur cultural elements ke saath beautification aur development bhi kiya jaayega. Is project mein high-level platform aur improved access roads bhi shamil hain. Prime Minister Narendra Modi ne virtual tarike se 554 railway stations ka redevelopment, jismein Morena bhi shamil hai, aur 1500 ROB aur RUB projects ke foundation stone ka inauguration kiya. Assembly Speaker ne announce kiya ki Samata Express train ab is hafte se Morena station par rukne lagegi, jisse Morena ke logon ki lambi time se chali a rahi demand puri hogi. Unhone yeh bhi kaha ki Morena mein railway facilities ka upgrade ₹20 crore se zyada kharch par kiya jaayega. Gwalior aur Kailaras ke beech ki train service next month tak chalne lagegi, aur is saal Gwalior railway line ko Sheopur tak extend karne ka lakshya hai.
Rail News
41554 views
0

IR Affairs
NCR/North Central
Feb 21 (10:28)   Gwalior-Sheopur MEMU Train Service Extension to Kailaras to be Inaugurated on February 26th

AdittyaaSharma^~   73037 news posts
Entry# 5975358   News Entry# 542219         Tags   Past Edits
read full article... Gwalior News: कैलारस तक मेमू ट्रेन चलाने की तैयारी, 26 फरवरी को प्रधानमंत्री मोदी वर्चुअली कर सकते हैं उद्घाटन

Prime Minister Narendra Modi is scheduled to virtually inaugurate several railway projects across India on February 26th, including the extension of the MEMU train service on the Gwalior-Sheopur broad gauge project from Gwalior to Kailaras. The project was initially launched in October 2023, with the train service commencing between Gwalior and...
more...
Sumawali. The train service was then extended to Jora, but the extension to Kailaras was delayed due to ongoing overhead electric line work. After a recent inspection by the Commissioner of Railway Safety, the line is expected to be operational soon. In addition to the train inauguration, Prime Minister Modi will also inaugurate nine railway crossings between Sithouli and Hetampur, along with 40 crossings on the Sheopur project. The inauguration is planned before the implementation of the Model Code of Conduct for the upcoming Lok Sabha elections in March.

26 February ko, Prime Minister Narendra Modi bahut saare railway projects ka virtual inauguration karenge, jisme Gwalior-Sheopur broad gauge project ka Gwalior se Kailaras tak MEMU train service ka extension bhi shamil hai. October 2023 mein, yeh project start hua tha, aur train service Gwalior aur Sumawali ke beech start hui...
more...
thi. Iske baad, train service ko Jora tak badhaya gaya tha, par Kailaras tak ka extension overhead electric line ka kaam puri hone ke karan delay ho gaya tha. Commissioner of Railway Safety ne recently inspection kiya hai, aur ab jald hi yeh line operational hone wali hai. Train inauguration ke saath saath, Prime Minister Modi Sithouli aur Hetampur ke beech 9 railway crossings, aur Sheopur project pe 40 crossings ka bhi inauguration karenge. March mein Lok Sabha elections ke liye Model Code of Conduct lagne se pehle yeh inauguration kiya ja raha hai.
Rail News
57479 views
1

IR Affairs
NCR/North Central
Feb 16 (23:07)   Trial Run Successful for Jaura-Kailaras Broad-Gauge Line, MEMU Train Service to Launch Soon

AdittyaaSharma^~   73037 news posts
Entry# 5971676   News Entry# 541673         Tags   Past Edits
read full article... जौरा-कैलारस के बीच नए ट्रैक पर 120 किमी की रफ्तार में दौड़ी ट्रेन, नए ट्रैक पर ट्रायल

A successful trial run of a train was conducted on the newly constructed broad-gauge railway track between Jaura and Kailaras, part of the third phase of the Newajyotipur-Morena-Gwalior broad-gauge line. The trial run was conducted under the supervision of the Commissioner of Railway Safety (CRS) at a speed of 120 kilometers...
more...
per hour. Railway officials declared the trial successful and are preparing to launch a MEMU train service between Gwalior and Kailaras by the end of this month. The first phase of the broad-gauge line, between Gwalior and Sumawali, was completed and inaugurated by Prime Minister Modi on Gandhi Jayanti. The second phase, covering Sumawali to Jaura-Alappur, was also completed and successfully tested two months ago. The third phase, encompassing Jaura-Alappur to Kailaras, spans 13 kilometers. Before the trial run, the CRS and railway officials thoroughly inspected the track, including its traction, signaling, gates, bridges, track points, and other functionalities. Following this, the trial run was conducted at 120 km per hour. The track from Kailaras to Sabalgarh, which is 95% complete, is being constructed at a height of 20 feet. The laying of tracks from Kailaras to Sabalgarh is underway, and upon completion, the total track length will reach 94 kilometers, nearly half of the total length between Gwalior and Sheopur. Bridge construction is in progress between Sabalgarh and Sheopur's Veerpur, with the largest bridge being built over the Kuno River. The MEMU train service between Gwalior and Sumawali currently has 8 coaches, but most of them run empty due to low passenger numbers, resulting in significant losses for the railway. The MEMU train service between Jaura and Sumawali runs three times a day. Railway officials believe that the launch of the Gwalior-Kailaras route will increase passenger numbers and necessitate adjustments to train schedules and frequencies. The railway team will now inspect the power lines before commencing the MEMU train service from Gwalior to Kailaras, which is expected to begin by the end of February.

Jaura aur Kailaras ke beech banaye gaye broad-gauge railway track pe, jo ki Newajyotipur-Morena-Gwalior broad-gauge line ke teesre phase ka hissa hai, ek train ka trial run successfully kiya gaya. Yeh trial run Commissioner of Railway Safety (CRS) ki dekh-rekh mein 120 kilometers per hour ki speed pe kiya gaya. Railway...
more...
officials ne is trial ko successful bataya aur is mahine ke aakhir tak Gwalior se Kailaras tak MEMU train service shuru karne ki taiyari kar rahe hain. Broad-gauge line ka pehla phase, Gwalior aur Sumawali ke beech, pura ho gaya tha aur usko Prime Minister Modi ne Gandhi Jayanti pe shuru kiya tha. Dusra phase, Sumawali se Jaura-Alappur tak, bhi pura ho chuka hai aur do mahine pehle iska trial run successfully ho gaya tha. Teesra phase, Jaura-Alappur se Kailaras tak, 13 kilometers lamba hai. Trial run se pehle, CRS aur railway officials ne track ka ghanta nirikshan kiya, jismein traction, signaling, gates, bridges, track points, aur aise hi kuchh aur functionalities shamil the. Iske baad, trial run 120 km per hour ki speed pe kiya gaya. Kailaras se Sabalgarh tak ka track, jo ki 95% pura ho chuka hai, 20 feet ki unchaai pe banaaya ja raha hai. Kailaras se Sabalgarh tak track lagane ka kaam chal raha hai, aur iske pura hone pe, track ki kul lambai 94 kilometers ho jayegi, jo ki Gwalior aur Sheopur ke beech ki kul lambai ka aadha hai. Sabalgarh aur Sheopur ke Veerpur ke beech bridge banne ka kaam chal raha hai, jismein sabse bada bridge Kuno River pe banaaya ja raha hai. Gwalior aur Sumawali ke beech chalne wali MEMU train mein 8 coaches hain, lekin inme se zyadatar coaches khali chalte hain, kyonki yah route pe railway ko passengers hi nahi mil rahe, jiski wajah se railway ko har roz laakhon rupaye ka nuksan ho raha hai. Jaura aur Sumawali ke beech chalne wali MEMU train din mein teen baar chalti hai. Railway officials ka मानना hai ki Gwalior-Kailaras route shuru hone pe, train ki frequency aur timings mein badlaav aayega. Sumawali ke alawa, Jaura aur Kailaras ke passengers ko ab Gwalior se direct connection milega, jiske wajah se train ko passengers ka aavishkaar milega. Railway team ab power lines ka nirikshan karegi, iske baad MEMU train service Gwalior se Kailaras tak shuru kar di jayegi, jiske February ke aakhir tak shuru hone ki sambhavna hai.
Rail News
32496 views
0

IR Affairs
NCR/North Central
Jan 14 (12:41)   Gwalior-Sheopur Broad Gauge Project: MEMU Train Extension Delayed, Focus Shifts to Kailaras

AdittyaaSharma^~   73037 news posts
Entry# 5941918   News Entry# 537489         Tags   Past Edits
read full article... Gwalior Sheopur Broad gauge news: जौरा के बजाय अब सीधे कैलारस तक मेमू ट्रेन चलाने की तैयारी

The extension of the MEMU train service from Gwalior to Jaura, part of the Gwalior-Sheopur Broad Gauge project, has been delayed due to pending inspection of the overhead electricity line (OHE). The train currently runs three times a day between Gwalior and Sumawali. The Commissioner of Railway Safety (CRS) inspected the...
more...
track and expressed satisfaction, but the lack of OHE inspection has prevented further progress. Initially, the railway planned to extend the MEMU service to Kailaras before the Lok Sabha elections, but due to the delay, they now aim to run the train directly to Kailaras. The Gwalior-Sheopur Broad Gauge project, costing approximately 3,000 crores, is being implemented in three phases. The first phase, from Birla Nagar to Sabalgarh, is nearly complete. The line will then extend to Shyampur and finally to Sheopur. The CRS has been invited to inspect the track and OHE line between Sumawali and Kailaras, with the inspection likely to take place on January 20th. Meanwhile, work has begun on the 70-kilometer stretch between Virpur and Sheopur, which includes laying tracks, building bridges, and constructing eight stations. The Sabalgarh station is already completed and located near Sewaram Bagh, about 1.5 kilometers away from the old narrow gauge station. The CRS is expected to inspect the track for the extension to Kailaras within the next week.

Gwalior se Sheopur tak ka Broad Gauge project, jisme Gwalior se Sumawali tak chalta MEMU train ka Jaura tak ka extension, overhead electricity line (OHE) ke inspection mein delay ki wajah se ruk gaya hai. Train abhi Gwalior aur Sumawali ke beech din mein teen baar chalti hai. Commissioner of Railway...
more...
Safety (CRS) ne track ka inspection kiya aur satisfaction diya, lekin OHE inspection na hone ki wajah se train aage nahi jaa pa rahi hai. Pehle, railway ne Lok Sabha elections se pehle MEMU train ko Kailaras tak chalaane ka plan banaya tha, lekin delay ki wajah se ab unka target sidha Kailaras tak train chalaana hai. Gwalior-Sheopur Broad Gauge project, jiska cost almost 3,000 crore hai, three phases mein implement kiya ja raha hai. Birla Nagar se Sabalgarh tak pehla phase almost complete ho chuka hai. Line then Shyampur aur phir Sheopur tak jaayegi. CRS ko Sumawali aur Kailaras ke beech track aur OHE line ka inspection karne ke liye invitation bheja gaya hai. Expected hai ki inspection 20 January ko hoga. Iske saath hi, Virpur se Sheopur ke beech 70 kilometer stretch pe kaam shuru ho chuka hai, jisme tracks, bridges, and eight stations banaye jaa rahe hain. Sabalgarh station already complete ho chuka hai aur ye old narrow gauge station se 1.5 kilometer door, Sewaram Bagh ke taraf banaya gaya hai. CRS ko ummid hai ki next week mein Kailaras tak extension ke liye track ka inspection ho jaayega.
Page#    Showing 6 to 10 of 29 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy