Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sat Sep 14 00:34:06 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 541882
Feb 18 (21:46) Rishikesh-Karnprayag Rail Project: Tunnel Excavation Complete, Track Laying Begins Soon
IR Affairs
7774 views
1

News Entry# 541882   
  Past Edits
This is a new feature showing past edits to this News Post.
Trains:  Chamundi Express/16216  
कर्णप्रयाग रेल परियोजना पर जल्द शुरू होगा ट्रैक का निर्माण, इसी माह आवंटित होंगे टेंडर; 71 प्रतिशत सुरंगों की हो चुकी खोदाई

The Rishikesh-Karnprayag Rail Project, a dream project of Prime Minister Narendra Modi, is being built at a cost of ₹16216 crore. Over ₹10748.29 crore has been spent on the project so far. The project is 71% complete in terms of tunnel excavation. The 125 km long project between Rishikesh and Karnprayag...
more...
will have 104 km of rail line passing through 17 tunnels. In addition to these 17 tunnels, the project also includes 12 exit tunnels, as well as adits and cross passages, making the total tunnel length 213 km. So far, 150.809 km of tunnel excavation has been completed out of a total of 213.277 km. The Rail Vikas Nigam Limited (RVNL), the executing agency, is also progressing with the final lining of the tunnels as the excavation work is completed. The RVNL has now invited bids for the laying of the railway track on the Karnprayag rail project. The bids will be awarded on February 24th and the construction of the rail track is expected to begin a month later. The railway track will be a blastless track, similar to those used in metro rail systems or railway stations, instead of the traditional blasted track made with stone ballast. This is due to the fact that 104 km of the rail line will pass through tunnels. While the track within the tunnels will be blastless, the section of the track outside the tunnels will be built using the traditional blasted technique. The total track length will be 133 km blastless and 42 km blasted. Blastless tracks are more robust and require less maintenance.

Rishikesh-Karnprayag Rail Project, PM Modi ka ek dream project hai, ₹16216 crore ke budget mein ban raha hai. Abhi tak ₹10748.29 crore se zyada kharch ho chuka hai. Project mein tunnel excavation 71% complete ho chuka hai. Rishikesh se Karnprayag tak ka 125 km long project mein 104 km rail line...
more...
17 tunnels se hoke guzarega. In 17 tunnels ke alawa, project mein 12 exit tunnels, adits aur cross passages bhi hain, jo ki total tunnel length 213 km banate hain. Abhi tak, 213.277 km tunnel mein se 150.809 km ki excavation complete ho chuki hai. Rail Vikas Nigam Limited (RVNL), jo ki project ko execute kar raha hai, tunnel excavation ke saath saath final lining ka kaam bhi kar raha hai. RVNL ne ab Karnprayag rail project par railway track ke liye bids invite ki hain. Bids 24 February ko award ki jaengi aur rail track ka construction ek month baad start hone ki umeed hai. Railway track blastless track hoga, jaise ki metro rail systems ya railway stations mein use kiya jata hai, traditional blasted track, jismein stone ballast use hota hai, ki jagah. Ye isliye hai ki 104 km rail line tunnels se hoke guzaregi. Tunnel ke andar track blastless hoga, lekin tunnel ke bahar ka track traditional blasted technique se banaya jayega. Total track length 133 km blastless aur 42 km blasted hoga. Blastless tracks zyada strong aur safe hote hain aur unki maintenance bhi kam chahiye.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy