Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark modesite support
 
Sun Sep 8 02:26:10 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Advanced Search
<<prev entry    next entry>>
News Entry# 541872
Feb 18 (21:40) Sewage Overflow in Bilimora Railway Underpass Causes Hardship for Residents (www.divyabhaskar.co.in)
IR Affairs
WR/Western
1159 views
0

News Entry# 541872   
  Past Edits
This is a new feature showing past edits to this News Post.
read full article... કામગીરી:બીલીમોરા રેલવે અંડરપાસ બંધ કરાતા અડધો કિ.મી.નો ચકરાવો

Residents of Bilimora are facing hardships due to the frequent flooding of sewage water in the railway underpass. To permanently solve this issue, the municipality started construction of a new box culvert, 20 feet wide and 141 meters long, at a cost of Rs. 2.11 crore. However, the underpass is currently...
more...
closed due to the construction, adding to the inconvenience as the level crossing was permanently closed after the overbridge was built. Pedestrians are forced to take a longer route, and rickshaw drivers are taking advantage of the situation by charging exorbitant fares. This situation is particularly difficult for students who have to walk or cycle long distances. People are demanding a solution to this problem.

Bilimora mein, railway underpass mein ganda pani aata rehta hai, isse logon ko bahut pareshani ho rahi hai. Is problem ko permanently solve karne ke liye, municipality ne 2.11 crore rupees ke kharche se 20 foot chauda aur 141 meter lamba, ek naya box culvert banaya ja raha hai. Par abhi...
more...
underpass band hai, isse aur dikkat ho rahi hai kyunki overbridge banne ke baad level crossing permanent band ho gaya tha. Logon ko ab chakkar lagana pad raha hai aur rickshaw wale bahut zyada paise maang rahe hain. Students ke liye toh yeh aur mushkil hai, unhe bahut door tak chalna padta hai. Log is problem ka hal chahte hain.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy