The old and the new Goomties or Gateman Huts. As posted earlier also , All the old goomties in Patiala are being re-constructed as new ones , shifting them a little away from the tracks , is a part of upgradation of Panel Interlocking work ,which shall be occurring between Kauli to Kaulseri through Patiala on the Rajpura-Dhuri section. In the picture I have shown Old(on the left) and New (on the right) are at LC no 16. The Old ones shall be demolished once the PI work is done.
#Patiala #PanelInterlocking #Goomties. The other goomties in Patiala which are already under construction or constructed other than this one are, LC 20 (already constructed), LC 23 (already constructed) , LC 24 (already constructed) LC 15c has been converted in to ROB , hence shall be shut. LC 14 and 19 might get converted into RUB.