#BIG_NEWS the following message from the Chief Electrical Engineer of CR – Shri. G. R Agarwal, that “No issues observed. Operation on Alternating Current Charging was Successful”
With that, my mission to cover the 25KV AC Test Charge between TNA/Mumbra till CSTM Mumbai was accomplished.