Its not 4 hrs, its late by 6 h and 30 mins.. Thanx to NCR controllers which delayed the down train yesterday, so it had to be rescheduled. And after rescheduling it crossed sirsaul at 0614 h, but reached Kanpur at 0727 hrs, and gomti arrived at 0734 h, but they allowed gomti to proceed and it has departed Kanpur at 0753 hrs.. 26 mins halts.. And it has halted at outers of stations where Gomti has halts and it will reach after 3 PM which will mean a delayed departure from Ndls too.. And this will continue till its cancelled.. As NCR will now be very happy, as it was not cancelled since Jul and the controllers were feeling the pinch from their top brass to bring ECR to loss, by getting it cancelled..