I think IR is going to increase 3A coaches for this train (12432) to 10. As the "get schedule" tab in indianrail.gov.in shows 10 3A coaches in July. And in june it is 9.
Can anyone conform this?? Also based on the same page train is still running with 9 3A coaches. Is this true??