At Bhedia(BDH) we were made to pass via Loop as there was a train waiting in the Main Line,finally reached Bolpur Shantiniketan @ 13.53 left after 4 mts Halt...after BHP,it didnt had much time to pick up the speed as soon again @ PNE,there was another BOXN waiting in the Main Line so we were again passed through Loop....then slowly we started gaining some speed...
One can see that Electrification work is going on in full swing as the OHE poles are ready in the SBG Loop...