सोनपुर में 12 व समस्तीपुर में 32 आरओबी का होगा निर्माणTo improve road and rail passenger movement, the East Central Railway (ECR) is constructing numerous Road Overbridges (ROBs) and Road Underbridges (RUBs) at level crossing gates. The ECR aims to build 109 ROBs and 304 RUBs/LHS in its jurisdiction. The Sonpur division will see 12 ROBs and 11 RUBs, while the...
more... Samastipur division will have 32 ROBs and 10 RUBs under construction. Currently, 15 ROBs and 55 RUBs are operational in Sonpur, and 20 ROBs and 61 RUBs are operational in Samastipur. Construction of ROBs in Dhanbad, Pt. DD Upadhyaya (Mughalsarai), and Danapur is complete, and traffic has begun. The ECR has a total of 244 operational ROBs and 383 operational RUBs across its jurisdiction.
Road aur rail passengers ke liye aasaan aur safe travel ke liye, East Central Railway (ECR) level crossing gates par Road Overbridges (ROBs) aur Road Underbridges (RUBs) bana raha hai. ECR apne area mein 109 ROBs aur 304 RUBs/LHS banane wala hai. Sonpur division mein 12 ROBs aur 11 RUBs, aur...
more... Samastipur division mein 32 ROBs aur 10 RUBs ban rahe hain. Ab Sonpur mein 15 ROBs aur 55 RUBs, aur Samastipur mein 20 ROBs aur 61 RUBs chal rahe hain. Dhanbad, Pt. DD Upadhyaya (Mughalsarai), aur Danapur mein ROBs ban gaye hain, aur traffic start ho gaya hai. ECR ke area mein total 244 operational ROBs aur 383 operational RUBs hain.