Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 13 08:58:09 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6123164
Posted: Jul 12 (22:20)

No Responses Yet
Rail News
23358 views
0

New Facilities/Technology
Jul 12 (22:20)   Haryana to Conduct Feasibility Study for Eastern Orbital Rail Corridor

totalonlinenews   388 news posts
Entry# 6123164   News Entry# 560140         Tags   Past Edits
सोनीपत, पलवल को उत्तर प्रदेश से जोड़ेगा यह 135 किलोमीटर लंबा कॉरिडोर, सरकार ने दी मंजूरी

The Haryana Rail Infrastructure Development Corporation (HRIDC) will conduct a feasibility study for the Eastern Orbital Rail Corridor (EORC) project. This proposed 135 kilometer long corridor will run parallel to the Eastern Peripheral Expressway, connecting Palwal in Haryana to Sonipat, passing through Ghaziabad, Noida, and Baghpat in Uttar Pradesh. The corridor...
more...
is estimated to have 90 kilometers in Uttar Pradesh and the remaining 45 kilometers in Haryana. The Uttar Pradesh government has tasked HRIDC with conducting the feasibility study. This was announced by the Chief Secretary and HRIDC Chairman, TVSN Prasad, during the 28th meeting of the corporation's board of directors. HRIDC is also conducting feasibility studies for other railway projects, including a new railway line between Narwana and Uklana (approximately 27 kilometers) and a new chord line in Kurukshetra (approximately 10 kilometers). The Railway Board has approved the final location survey for the Karnal-Yamunanagar new railway line. HRIDC is working with the Ministry of Railways to get early approval for this project.

Haryana Rail Infrastructure Development Corporation (HRIDC) Eastern Orbital Rail Corridor (EORC) project ka feasibility study karega. Yeh 135 kilometer lamba corridor Eastern Peripheral Expressway ke saath saath chalega, jo Haryana ke Palwal ko Uttar Pradesh ke Ghaziabad, Noida, aur Baghpat se Sonipat se jodta hai. Is corridor ke 90...
more...
kilometer UP mein aur baki 45 kilometer Haryana mein hone ka anuman hai. UP government ne HRIDC ko yeh feasibility study karne ka kaam diya hai. Yeh baat Chief Secretary aur HRIDC ke Chairman, TVSN Prasad ne corporation ke board of directors ki 28th meeting mein bataya. HRIDC aur bhi railway projects ke liye feasibility studies kar raha hai, jaise ki Narwana aur Uklana ke beech ek nayi railway line (lagभग 27 kilometer) aur Kurukshetra mein ek nayi chord line (lagभग 10 kilometer) banane ke liye. Railway Board ne Karnal-Yamunanagar nayi railway line ke liye final location survey ko approval de diya hai. HRIDC is project ke liye jaldi approval pane ke liye Railway Ministry ke saath kaam kar raha hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6186110  10Rail_0326~
6186432 ★★★ 41PankajMishra^~
3368675 ★★★ 393mr.train_wala~
6007860 ★★★ 113RailwayFiles~
3619297 ★★★ 396HBR^~
4307803 ★★★ 178AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy