IMO this passenger should be restored and extended till Bhuj via WKR MALB and an RSA with 59229/30 BVC DHG
The schedule can be kept as
PBR - BHUJ - BVC (59212 - 59229)
BVC - BHUJ - PBR (59211 - 59230)
PM...
more... at either of PBR or BVC.
Additional services can be introduced from OKHA SMNH and PBR via JLR WSJ so that all get connectivity to BHUJ.
please wait...Translate to EnglishThis passenger train should go all the way to Bhuj through WKR MALB and link up with the 59229/30 BVC DHG train. The plan could look like this: PBR - BHUJ - BVC (59212 - 59229), BVC - BHUJ - PBR (59211 - 59230), with overnight maintenance at PBR or BVC. To make sure everyone can reach Bhuj, additional services should start from OKHA SMNH and PBR via JLR WSJ.