Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 8 00:18:21 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6113395
Posted: Jul 03 (21:50)

No Responses Yet
Rail News
6373 views
0

CR/Central
Jul 03 (21:50)   Nagpur Railway Station Undergoes Major Revamp: New Foot Overbridges, Parking, and More

Chetan~   1202 news posts
Entry# 6113395   News Entry# 558798         Tags   Past Edits
read full article... विकास: नागपुर रेलवे स्टेशन का दिसंबर 2025 में पूरा होगा काम, बनेगा वर्ल्ड क्लास स्टेशन

Nagpur Railway Station is undergoing a major makeover by the Rail Land Development Authority (RLDA) Maharashtra. Construction work is progressing as planned in both the eastern and western sections of the station. The project aims to complete by December 2025, resulting in a transformed station capable of handling 98,000 passengers daily....
more...
The renovation includes separate foot overbridges for arrivals and departures, a 108-meter-wide area with passenger amenities and retail options, and a two-storey departure and arrival plaza on the west side with basement and surface parking. The eastern side will feature a 5-storey arrival building (currently at the 3rd floor), a 2-storey departure building (construction at the 2nd floor), and a temporary booking counter. On the west side, a 7-storey railway administration building is under construction, with its foundation completed. The work on the basement is being carried out in phases to minimize disruption, with 50% completed and the remaining work to begin by August 2024. The project's estimated cost is ₹487.77 crore, with work starting last year. Completed tasks include soil testing, site lab setup, batching plant installation, utility shifting in the east, new entry/exit for milk siding, parking area, and traffic changes, and the installation of a wheel washing unit.

Nagpur Railway Station ka kaaya kalp RLDA Maharashtra ke taraf se ho raha hai. Station ke purva aur paschim dono taraf construction kaam chal raha hai. December 2025 tak yeh project complete hone ka target hai, jiske baad 98,000 passengers ko daily handle karne wala yeh station transform ho jaayega. Isme...
more...
alag alag foot overbridges arrivals aur departures ke liye, 108 meter wide area jisme passenger facilities aur retail options honge, aur paschim side pe do majal ka departure aur arrival plaza, jisme basement aur surface parking bhi hoga. Purva side pe 5 majal ka arrival building (abhi 3rd floor tak) ban raha hai, aur 2 majal ka departure building (construction 2nd floor pe). Ek temporary booking counter bhi ban gaya hai. Paschim side pe 7 majal ka railway administration building ban raha hai, jiska foundation complete ho chuka hai. Basement ka kaam phase-wise chal raha hai, jisse traffic disrupt na ho. 50% complete ho gaya hai aur baki kaam August 2024 tak shuru hoga. Project ki estimated cost ₹487.77 crore hai, aur kaam last year se shuru hua tha. Soil testing, site lab setup, batching plant installation, purva side mein utility shifting, milk siding, parking area, aur traffic changes ke liye new entry/exit complete ho gaya hai, aur wheel washing unit bhi install ho gaya hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy