Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Sep 9 23:39:10 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6087428
Posted: Jun 07 (19:30)

No Responses Yet
Rail News
1193 views
0

IR Affairs
CR/Central
Jun 07 (19:30)   Milestone Achieved: Breakthrough of Longest Tunnel on Mumbai Suburban Railway Network

Exynos9611~   18881 news posts
Entry# 6087428   News Entry# 555068         Tags   Past Edits
Milestone Achieved: Breakthrough Of Tunnel-2, The Longest Tunnel On Mumbai Suburban Railway Network

The Mumbai Railway Vikas Corporation (MRVC) has successfully completed the excavation of Tunnel-2 (Wavarle Tunnel), the longest tunnel in the Mumbai Suburban Railway Network, as part of the Panvel-Karjat railway project under the Mumbai Urban Transport Project 3 (MUTP-3). This tunnel, measuring 2625 meters in length, is one of three tunnels...
more...
being constructed as part of the project, totaling 3164 meters. Excavation began on February 22, 2023, and the breakthrough was achieved on June 7, 2024. The project faced challenges including fractured rock masses with water seepage and minimal cover, but these were overcome through meticulous planning and the use of advanced technology. The tunnel features ballast-less track, public refuge areas, and various safety and comfort systems. The project is expected to be completed by December 2025, enhancing connectivity and transportation efficiency in the Mumbai suburban region.

Mumbai Railway Vikas Corporation (MRVC) ne Panvel-Karjat railway project ke under Mumbai Urban Transport Project 3 (MUTP-3) mein, Mumbai Suburban Railway Network ka sabse lamba tunnel, Tunnel-2 (Wavarle Tunnel) ka excavation successfully complete kar liya hai. Yeh tunnel 2625 meters lamba hai, aur yeh project ke under banaye ja rahe teen...
more...
tunnels mein se ek hai, jin ki total length 3164 meters hai. Excavation February 22, 2023 ko shuru hua tha, aur breakthrough June 7, 2024 ko achieve kiya gaya. Project mein fractured rock masses with water seepage aur minimal cover jaise challenges aaye, par meticulous planning aur advanced technology ke use se inhe overcome kiya gaya. Tunnel mein ballast-less track, public refuge areas, aur various safety and comfort systems hain. Project December 2025 tak complete hone ki ummeed hai, aur yeh Mumbai suburban region mein connectivity aur transportation efficiency ko enhance karega.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy