Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 14 15:51:30 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6077252
Posted: May 27 (19:40)

No Responses Yet
Rail News
1482 views
1

IR Affairs
BULT/Bullet Train
May 27 (19:40)   Mumbai-Ahmedabad Bullet Train Project Achieves Major Breakthrough with Completion of ADIT in Navi Mumbai

DrAbhijay2407   380 news posts
Entry# 6077252   News Entry# 553759         Tags   Past Edits
Mumbai-Ahmedabad Bullet Train Project Advances with the Completion of ADIT Tunnel

The Mumbai-Ahmedabad Bullet Train project, spanning 508.17 km, achieved a significant milestone with the completion of a 394-meter-long Additionally Driven Intermediate Tunnel (ADIT) in Navi Mumbai by Afcons Infrastructure. The ADIT, located on the eastern side of Package C-2, serves as an access point for initiating excavation work for the main...
more...
tunnel using the New Austrian Tunneling Method (NATM). The ADIT, featuring a 42-meter deep inclined shaft, will allow for NATM tunneling in two directions, westward towards Sawli's Shaft-3 (1.6 km) and eastward towards Shilphata's tunnel portal (1.8 km). Package C-2, awarded to Afcons Infrastructure in June 2023, encompasses the construction of three shafts at BKC Station, Vikhroli, and Sawli, which will serve as launch and retrieval points for three Mega Tunnel Boring Machines (TBMs). The TBMs will bore approximately 16 kilometers of tunnel. The Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR), India's first bullet train project, features 12 stations and is designed for bullet trains operating at speeds of up to 320 kmph. The project is expected to commence operations in August 2026.

Mumbai-Ahmedabad Bullet Train project mein ek bada breakthrough aaya hai jab Afcons Infrastructure ne Navi Mumbai mein 394 meter lamba Additionally Driven Intermediate Tunnel (ADIT) bana diya. Yeh ADIT Package C-2 ke eastern side mein hai aur yeh main tunnel ke liye excavation ka kaam start karne ke liye access point...
more...
ka kaam karega. ADIT mein 42 meter deep inclined shaft hai aur isse NATM tunneling do directions mein hogi, westward Sawli's Shaft-3 ki taraf (1.6 km) aur eastward Shilphata ke tunnel portal ki taraf (1.8 km). June 2023 mein Afcons Infrastructure ko Package C-2 diya gaya tha jisme BKC Station, Vikhroli, aur Sawli mein teen shafts banane ka kaam hai. Yeh shafts three Mega Tunnel Boring Machines (TBMs) ke liye launch and retrieval points ka kaam karenge. TBMs around 16 kilometer tunnel bore karenge. Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR), India ka pehla bullet train project hai, jisme 12 stations hain aur yeh bullet trains ke liye designed hai jo 320 kmph ki speed se chalenge. August 2026 mein project start hone ki ummeed hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6186432 ★★★ 41PankajMishra^~
4402199 ★★★ 264AvishekRay~
4387942 ★★★ 61AvishekRay~
6186110  11Rail_0326~
5955786 ★★★ 51fanof12801~
6177596 ★★ 29KeepTravelling^~
3368675 ★★★ 393mr.train_wala~
6007860 ★★★ 113RailwayFiles~
3619297 ★★★ 396HBR^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy