Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Sep 13 12:46:06 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6032069
Posted: Apr 16 (10:01)

No Responses Yet
Rail News
14188 views
0

IR Affairs
WCR/West Central
Apr 16 (10:01)   Jabalpur Flyover Construction: 12-Hour Train Blocks Needed, Railway Refuses

AdittyaaSharma^~   73345 news posts
Entry# 6032069   News Entry# 548555         Tags   Past Edits
Jabalpur News : मदनमहल स्टेशन से 70 मीटर का फ्लाईओवर निकलने 12 घंटे का मांगा ब्लाक, नहीं मिली परमिशन

The construction of a 6 km long flyover in Jabalpur is nearing completion. The only remaining section is a 70-meter cable bridge above Madan Mahal railway station. To complete this section, the PWD requires 7 blocks of 12 hours each between April and July, halting train traffic. However, the railway department...
more...
is unwilling to provide such long blocks, offering only 4-5 hour blocks. The railway department has suggested that the PWD complete tasks requiring train stoppage in the first 6 hours of each 12-hour block and handle the remaining work during train operation. They have also stated that any block longer than 4-5 hours requires approval from the Railway Board. The PWD has been asked to prepare a revised plan, and the final decision will be made after approval from the Railway Board. The completion of the cable bridge is estimated to take 2-3 months and will likely impact train services in Jabalpur, Adhartal, and Bhedaghat. The exact details of affected trains and passenger inconvenience are still under evaluation.

Jabalpur mein 6 km lamba flyover ban raha hai, aur usme sirf 70 meter lamba cable bridge Madan Mahal railway station ke upar banna baki hai. Iske liye PWD April se July ke beech 7 baar 12-12 ghante ka block chahta hai, jisse train ka chalna band ho jayega. Lekin railway...
more...
itna lamba block dene ke liye ready nahin hai aur sirf 4-5 ghante ka block dene ke liye taiyaar hai. Railway ne PWD ko kaha hai ki wo 12 ghante ke pehle 6 ghante mein wo kaam karein jo train band karne par hi ho sakta hai, aur baki 6 ghante mein wo kaam karein jo train chalte hue bhi kiya ja sakta hai. Unhone ye bhi kaha hai ki 4-5 ghante se zyada ka block dene ke liye Railway Board se permission chahiye. PWD ko ek naya plan banane ko kaha gaya hai aur Railway Board se approval milne ke baad aakhri faisla hoga. Cable bridge ke poora hone mein 2-3 mahine lag sakte hain aur Jabalpur, Adhartal, aur Bhedaghat mein train service par asar pad sakta hai. Kis kis train ko asar padega aur kitne passengers ki journey aur reservation cancel hogi, yeh abhi decide nahi hua hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

6177596 ★★ 29KeepTravelling^~
6186110  10Rail_0326~
6186432 ★★★ 41PankajMishra^~
3368675 ★★★ 393mr.train_wala~
6007860 ★★★ 113RailwayFiles~
3619297 ★★★ 396HBR^~
4307803 ★★★ 178AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy