inspecting the Electrification (RE) status between NCB - DBB ЁЯдЮЁЯдЮ
@BDYR: Bidyar Dabri 2 km <--> 6 km @AGMN: Agomoni 36km/h 3h 55m late@BDYR: Bidyar Dabri &25 km/h from Bidyardabri to agomoni wires are not installed to the Poles.