Rameswaram-Okha is going to be LHB-fied from 08-March from RMM(MMM) end and 12-March from OKHA end.
No major changes in composition except general class coaches.
Composition follows as 2 Second AC, 8 Third AC , 6 SL, 2GN + 1SLR + 1Pantry and generator Car.