So most probably Cansaulim Majorda track doubling will be done by May end. Kulem Kalem I think forest area so permissions are pending but works have begun on both Kulem and Kalem outers.
In Vasco to Cansaulim stretch works between Vasco to Dabolim are pending coz of they have to cut the hills on which a lot of people are residing and Dabolim to Sankval the terrain is difficult. Sankval to Cansaulim can be commissioned soon too if the people opposing are dealt in a cordial manner.