Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 15 23:03:33 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5985319
Posted: Mar 02 (22:44)

No Responses Yet
Rail News
5847 views
0

Metro
WR/Western
Mar 02 (22:44)   Indore Metro Project Advances: Steel Girders Launched Over Railway Line

AdittyaaSharma^~   73431 news posts
Entry# 5985319   News Entry# 543651         Tags   Past Edits
Indore Metro Train: इंदौर के एमआर-10 रेलवे लाइन पर मेट्रो के लिए स्टील गर्डर की लांचिंग, चार घंटे का लिया ब्लाक

Indore's metro project is progressing rapidly, with construction underway on the track from Gandhi Nagar Chowk to MR-9 Chowk on Ring Road, via Super Corridor. Two large steel girders, each 45 meters long, were lifted onto piers above the railway line at MR-10. This required a four-hour block of...
more...
time and two large cranes. The process of connecting the girders began two months ago using thousands of nuts and bolts. Once the girders are in place, the next step is to lay the tracks after placing concrete slabs on top of the girders. Because the PAC segment's launching is not allowed over the railway line, steel girders are being used instead, and the piers were built away from the railway line. A similar process of launching two steel girders will take place on the railway line above the Super Corridor within a week. The construction of a two-story metro station at MR-10 is ongoing. The station will be directly connected to the ISBT at MR-10, providing convenient access to metro services for passengers arriving at the bus stand.

Indore ka metro project bahut tez chal raha hai. Gandhi Nagar Chowk se Super Corridor se hota hua Ring Road ke MR-9 Chowk tak track banaya ja raha hai. MR-10 pe railway line ke upar 45 meter lamba do bada steel girders ko piers pe chadhaya gaya. Iske liye 4 hours...
more...
ka block tha aur do bada cranes ka sahayta thi. Girders ko jodne ka kaam do mahina pehle shuru hua tha, hazaron nuts and bolts se. Ab steel girders ke upar slabs dal ke tracks bichane ka kaam shuru hoga. Railway line ke upar PAC segment launch karne ki permission nahi hai, isliye steel girders use kiya ja raha hai. Piers bhi railway line se door banaye gaye hain. Super Corridor pe railway line ke upar bhi steel girders launch kiye jayenge. Ek hafta ke andar launch kar diya jayega. MR-10 pe metro ka station bhi ban raha hai. Do manzil ka station ka kaam chal raha hai, jo ISBT se direct connect hoga. Bus stand aane wale passengers ko metro ki facility milegi.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3619297 ★★★ 399HBR^~
3368675 ★★★ 396mr.train_wala~
6007860 ★★★ 117RailwayFiles~
6186110  14Rail_0326~
6186432 ★★★ 43PankajMishra^~
4402199 ★★★ 264AvishekRay~
4387942 ★★★ 61AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy