Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Sep 7 20:39:38 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5972550
Posted: Feb 17 (23:12)

No Responses Yet
Rail News
21482 views
0

Feb 17 (23:12)   Gauge Conversion Between Shahgarh and Pilibhit Nearing Completion, Train Services Expected Soon

PilibhitJunction^~   410 news posts
Entry# 5972550   News Entry# 541788         Tags   Past Edits
read full article... मार्च के आखिर तक शाहगढ़-पीलीभीत तक शुरू हो सकती है ट्रेन, आसान होगा सफर

The gauge conversion work between Shahgarh and Pilibhit is nearing completion. Only the electrification work between Mala and Sandei Halt remains. The safety inspection of this newly converted rail section is scheduled for the end of March, and train operations are expected to start before the code of conduct comes into...
more...
effect. With the commencement of train services from Shahgarh to Pilibhit, travel from Mailani to Pilibhit, Bareilly, and Delhi will become more convenient. The Railway Board awarded the contract to Rail Vikas Nigam Limited on May 30, 2018, for the gauge conversion of the Mailani-Pilibhit rail section. Train services between Mailani and Shahgarh have been operational since November 2018. However, the work between Shahgarh and Pilibhit faced delays due to objections from the Forest Department. After receiving the NOC, the contractor resumed work and laid the track between Shahgarh and Pilibhit.

Shahgarh aur Pilibhit ke beech ka gauge conversion ka kaam almost khatam ho gaya hai. Sirf Mala aur Sandei Halt ke beech ka electrification ka kaam baki hai. Is new gauge conversion ke baad safety inspection March ke end mein hoga, aur train services code of conduct laagu hone se pehle...
more...
shuru hone ki ummid hai. Shahgarh se Pilibhit tak train chalne se Mailani se seedha Pilibhit, Bareilly aur Delhi tak jaana asaan ho jaayega. Railway Board ne 30 May 2018 ko Rail Vikas Nigam Limited ko Mailani-Pilibhit rail section ka gauge conversion ka kaam diya tha. November 2018 se Mailani aur Shahgarh ke beech train services chalu ho gayi hain. Forest Department ki objection ke wajah se Shahgarh aur Pilibhit ke beech kaam mein der hui. NOC milne ke baad contractor ne kaam start kiya aur Shahgarh se Pilibhit tak track bithaya.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy