110 किलोमीटर प्रतिघंटे की रफ्तार से दौड़ी स्पेशल ट्रेन, परीक्षण सफलOn Tuesday, a special train ran at a maximum speed of 110 km/h on the newly constructed double railway track between Sitapur City and Sitapur Junction. The speed test was successful. The Chief Commissioner of Railway Safety, Janak Kumar Garg, also inspected the new 25,000-volt AC capacity power line on the...
more... four-kilometer-long track. The Northeast Railway Lucknow Division is continuously working on construction projects to enhance passenger facilities. To improve railway operations, the infrastructure is being expanded. As part of this, the four-kilometer rail section between Sitapur Junction and Sitapur City stations has been doubled. On Tuesday, the Chief Commissioner of Railway Safety, Janak Kumar Garg, and the Chief Administrative Officer (Construction) of the Northeast Railway, S.C. Srivastava, along with their team, arrived in the district. The Safety Commissioner first inspected the double-track and electrified railway section at Sitapur City (North Railway) to ensure adherence to safety standards. This included reviewing safety records, yard plan, station working rules, platform clearance, point crossing, signaling, berthing track ballast, and other technical aspects. Afterwards, the team departed from Sitapur City towards the junction at 11 am using a motor trolley. They inspected the point and crossing, 52 level crossings, SEJ number 50, major bridge number 65, curve number 34, minor bridge 139, curve number 32, level crossing number 93, station yard, and point and crossing within the station yards. Upon reaching the junction, the Safety Commissioner inspected the panel room, yard plan, station working rules, platform clearance, signaling, and the height of the overhead traction.
Mangalvaar ko, Sitapur City aur Sitapur Junction ke beech bane double railway track par ek special train 110 km/h ki speed se chali. Speed test successful raha. Mukhya Rail Suraksha Ayukt Janak Kumar Garg ne 4 kilometer lamba track par 25,000 volt AC capacity wali new electric line ka bhi inspection...
more... kiya. Purvaottar Railway Lucknow Mandal yaatri facilities ko improve karne ke liye continuously construction projects par kaam kar raha hai. Railway operations ko smooth banane ke liye infrastructure ko expand kiya ja raha hai. Iske liye, Sitapur Junction aur Sitapur City stations ke beech 4 kilometer rail section ko double kiya gaya hai. Mangalvaar ko, Mukhya Rail Suraksha Ayukt Janak Kumar Garg aur Purvaottar Railway ke Mukhya Prashasanik Adhikari (Nirman) S.C. Srivastava aur unki team district mein pahunche. Suraksha Ayukt ne sabse pehle Sitapur City (Uttar Railway) par double-track aur electrified railway section ko safety standards ke anuroop inspection kiya. Isme safety records, yard plan, station working rules, platform clearance, point crossing, signaling, berthing track ballast, aur other technical aspects ko review kiya gaya. Uske baad, team 11 baje motor trolley se Sitapur City se junction ki taraf nikli. Unhone stations ke beech padne wale station yard par point aur crossing, 52 level crossing, SEJ number 50, major bridge number 65, curve number 34, minor bridge 139, curve number 32, level crossing number 93, station yard, aur point aur crossing ka inspection kiya. Junction par pahunch kar, Suraksha Ayukt ne panel room, yard plan, station working rules, platform clearance, signaling, aur overhead traction ki unchai ko dekha.