Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 15 21:20:11 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 5969013
Posted: Feb 13 (22:39)

No Responses Yet
Rail News
1786 views
0

Metro
KMRL/Kochi Metro
Feb 13 (22:39)   Kochi Metro's First Phase Nearing Completion, Second Phase Gets Green Light

Exynos9611~   19291 news posts
Entry# 5969013   News Entry# 541248         Tags   Past Edits
തൃപ്പൂണിത്തുറ മെട്രോ സ്റ്റേഷൻ സർവിസിനുള്ള ഒരു​ക്കം അവസാന ഘട്ടത്തിൽ

The Kochi Metro's first phase is nearing completion, with the final station, Tripunithura Terminal Station, undergoing final construction. Trial runs are underway on the SN Junction-Tripunithura route. The Chief Metro Rail Safety Commissioner, Anand M. Chaudhary, is currently inspecting the Tripunithura station, focusing on passenger facilities, signaling, and tracks. His approval...
more...
is a crucial requirement before the station can commence operations. The station spans 1.35 lakh square feet, with 40,000 square feet allocated for ticket revenue enhancement initiatives. The Kochi Metro has implemented the Open Web Girder technology for the first time on the 60-meter stretch between SN Junction and Tripunithura stations. The first phase of the Kochi Metro, covering 28.125 km and encompassing 25 stations from Aluva to Tripunithura, is nearing completion. Meanwhile, the second phase of the Kochi Metro project is set to be streamlined with the cooperation of various departments and organizations. A meeting chaired by Collector N.S.K. Umesh discussed facilitating the construction of the metro line from Kalamassery Jawaharlal Nehru Stadium to Kakkanad Infopark. The project will involve widening existing roads and enhancing traffic flow. To avoid disruptions, alternate routes will be designated for large vehicles, excluding buses, ambulances, auto-rickshaws, and two-wheelers. The metro service, spanning 11 stations from Kalamassery Jawaharlal Nehru Stadium to Kakkanad via Chittethukara, is in progress. Land acquisition for the construction of seven stations has been finalized.

Kochi Metro ka pehla phase almost khatam ho chuka hai. Tripunithura Terminal Station, jo ki aakhri station hai, uski construction final stage mein hai. SN Junction aur Tripunithura ke beech metro line pe trial runs chal rahe hain. Chief Metro Rail Safety Commissioner, Anand M. Chaudhary, Tripunithura station ka inspection kar...
more...
rahe hain. Woh passenger facilities, signaling, and tracks check kar rahe hain. Station ko open karne se pehle unka approval bahut important hai. Station 1.35 lakh square feet mein ban raha hai, aur 40,000 square feet ticket revenue increase ke liye alag rakha gaya hai. SN Junction aur Tripunithura station ke beech 60 meter ke stretch mein Kochi Metro ne pehli baar Open Web Girder technology use kiya hai. Kochi Metro ka pehla phase 28.125 km lamba hai, aur ismein Aluva se Tripunithura tak 25 stations hain. Ab almost khatam hone wala hai. Iske sath hi, Kochi Metro ka dusra phase bhi jaldi start hoga. Alag alag departments aur organizations ke sahayog se is project ko speed up kiya jayega. Collector N.S.K. Umesh ki chair mein hue ek meeting mein Kalamassery Jawaharlal Nehru Stadium se Kakkanad Infopark tak metro line ki construction ko aasan banane ka discussion kiya gaya. Is project mein existing roads ko wide kiya jayega aur traffic flow ko better banaya jayega. Traffic mein disruption na ho iske liye, buses, ambulances, auto-rickshaws, aur two-wheelers ke alawa bade vehicles ke liye alag routes banaye jayenge. Kalamassery Jawaharlal Nehru Stadium se Kakkanad tak, Chittethukara se hota hua, 11 stations wali metro service chalane ki planning hai. Ismein se 7 stations ke liye land acquisition complete ho chuka hai.

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3619297 ★★★ 399HBR^~
3368675 ★★★ 396mr.train_wala~
6007860 ★★★ 117RailwayFiles~
6186110  14Rail_0326~
6186432 ★★★ 43PankajMishra^~
4402199 ★★★ 264AvishekRay~
4387942 ★★★ 61AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy