कपलिंग टूटने से दो भाग में बटी मालगाड़ीOn Thursday evening around 6:33 PM at Vindhyachal Railway Station, a goods train split into two parts due to a coupling failure on platform number 3. The guard immediately informed the driver, and the train was stopped. The Gonda-Nagpur 58 goods train was halted on platform number 1 in the loop...
more... line. When the train moved forward, the coupling of a carriage broke, causing it to separate. The guard immediately informed the driver, and the driver stopped the train. Upon receiving the information, train examiner Phulchand, along with the driver and guard, managed to reconnect the two carriages. The goods train remained stationary on the platform for 15 minutes due to the coupling failure. The train was then dispatched at 6:48 PM under the supervision of RPF, GRP, and the station superintendent.
Thursday ke sham, almost 6:33 PM pe, Vindhyachal Railway Station ke platform number 3 pe, ek goods train coupling fail hone ki wajah se do hisson mein baat gayi. Guard ne driver ko jaldi se inform kiya aur train ko rok diya gaya. Gonda-Nagpur 58 goods train ko railway station ke...
more... platform number 1 pe loop line mein rok diya gaya tha. Thodi der baad jab train aage badhi toh ek carriage ka coupling tut gaya aur woh beech se hi do hisson mein baat gayi. Guard ne jaldi se driver ko inform kiya aur driver ne train ko rok diya. Information milne pe, train examiner Phulchand, driver aur guard ki mehnat se, dono carriages ko jod diya gaya. Coupling tutne ki wajah se goods train 15 minutes tak platform pe khadi rahi. RPF, GRP aur station superintendent ki supervision mein train ko 6:48 PM pe ravana kiya gaya.