What I's the work they are doing at Mustabad? For 45 days. Are they building flyover from left to right for cargo trains to enter dedicated bypass line being built. There are 2 road over bridges being bulit at peddaAvutapalle on Vskp line and Rayanpadu on Kazipet line for new 6 lane bypass NH16 waiting for railway bridge grider erection part for the past 4 months though work is completed in either side upto track. These works will take 30-45 days and TSR will be put with block if necessary.