Statutory inspection of RE works followed by speed trial at full sectional speed(110Kmph) in Lunkaransar–Lalgarh (72.2RKM/86.67TKM) single line section of Bikaner Division of NWR completed successfully. With this total commissioning by CORE during (2022-23) is 2418.4RKM/3210.8TKM