According to CMS report of freight train, the speed of train in NCB-GKJ section increased and reached to 84 kmps though MPS is 75 kmps.(58 km run in 41 minutes)
So, moderator/monitor sir ..plz consider the matter and increase the MPS of this section if necessary.
A screenshot of freight train given below..
Thanks
please wait...Translate to HindiCMS riport ke anusar, freight train ki speed NCB-GKJ section me badh gayi aur 84 kmps tak pahunch gayi hai jabki MPS 75 kmps hai. (41 minute me 58 km ki doori tay ki gayi hai).
Toh, moderator/monitor sir... plz is mamle ko dhyan me rakhe aur agar zarurat ho toh is section ke MPS ko badha dein.
Niche freight train ki screenshot hai..
Dhanyavaad.