** Vande Bharat operating at maximum speed of 130 kmph has much lower journey times or much higher average speed that other LHB trains on the same route with same 130kmph speed capacity and same/lesser stoppages, mainly due to "OVERRIDING PRIORITY ACCORDED TO THESE TRAINS".
** NDLS-Katra VB take 8 hrs against the 11:05/10:45 hrs taken by fully AC Shri Shakti express with same max speed potential.
**NDLS-BSB VB take 8 hrs against 10:20/10:10 hrs taken by Shiv Ganga Express with same stoppages