In pre-covid times, 18181/82 (now extended to Thawe) used to run with slip coaches of Tatanagar-Katihar Express which used to detach at BJU because of which nearly 1 hr halt was given at BJU. Now during covid times, the slip coaches aren't running but 08181/82 is running but halt at BJU is of 1 hr now also. Now I am going to make an Imaginary Speed up (SF category upgrade with halts reduced) of this train (18181/82) so should I keep the halt at BJU for 1 hr or reduce the halt to 15 mins or 20 mins or 25 mins. If I should reduce halt, then please suggest the tentative halt duration at BJU.
Thanks!