As per my recent journey. The Bijapur wandal section is still with 90MPS even though speed trial of 123MPS conducted to increase section MPS. The remaining factors like removing of LC manned gates and construction of RUB wherever required will make possible to increase MPS from 90 to 110 in this section. .