May be some one in NCR/IR giving tough time for SR/MAS trains.
There is no valid reason to still run TN at 110 MPS when its already running with 120MPS in SCR since LHB conversion.
No trains from MAS had TTZB. All were slowed down. Wastage if IR enhanced resources and time.