It was done because load differences at BSB station at that time, ER proposed the extension and was immediately accepted by NER. Although fair chunk of GNWL stayed with BSB as it is still the most revenue generating station, even more than PRRB.
please wait...Translate to EnglishIt happened coz of too many peeps at BSB station, so ER suggested the extension and NER was like, "Cool, let's do it!" Even though lotsa peeps with GNWL stuck with BSB coz it brings in the most cash, even more than PRRB.
please wait...Translate to HindiKaam ho gaya kyunki BSB station mein load ka farak tha uss time pe, ER ne extension ka sujhav diya aur NER ne turant accept kar liya. GNWL ka bada hissa BSB ke saath hi raha kyunki ye ab bhi sabse zyada revenue generate karne wala station hai, PRRB se bhi zyada.