I think this egoistic problem is simply carried by BZA division itself.
Normally 22203/04 type trains can cover SC - VSKP section in 9 hours.
In 22203/12784 and Railways is charging higher ticket price another side speed is equal to normal Superfast train.
Now people will say Duronto type trains are not Non - Stop trains.
Today,...
more... there is no difference between Duronto and SF. Even when they were introduced, they were only supposed to be non-stop trains. There wasn't any 'high speed' about them.
So what shell we do with Raj & Shatabdi which runs like
normal Superfast.
Let's degrad their priority ?????