Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Mon Aug 26 14:45:01 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 4752195
Posted: Oct 19 2020 (15:53)

No Responses Yet
Info Update
5532 views
1

Oct 19 2020 (15:53)   CRJ/Chittaranjan (3 PFs)
SOUTHEASTERNRAILWAYWAP7
SOUTHEASTERNRAILWAYWAP7   193 blog posts
Entry# 4752195            Tags  
********* ISSUES WITH IGBT LOCOS ********
BTIL
1 Software Issues
i Cable crimping Modification has been completed. No problem experienced afterwards.
ii Multiple software in VCU for BT make traction converter. Latest software version 1215 has nearly resolved
...
more...
the pending software issues. After this software only one software for VCU for all locos having BT make traction converter.
iii Catenary voltage out of limit Problem experienced in Kalyan. Under study by BTIL.
2 Other Issues
i Availability of Spare Parts & maintenance Stocking has been done at ELS/Gomoh and Vadodara. Gomoh to confirm the adequacy of spares.

ABB
1 Hardware Issues
i Failures of Power Module PEBB Module failures high (25 in 14-15). Firm submitted analysis report indicating flaw in manufacturing process. Defective lot have been identified and replaced except 11 power modules in two locomotives in AQ & BIA sheds. Serial no. HKTX03 ans HKOD17 to be checked in 31470.
ii Duagon Cards Large no of Duagon card failures including modified Duagon card (D709). Firm mentioned failures due to Firmware malfunctioning. Firmware up-gradation has been done in 6 locos at AQ, TKD and GZB. Performance found satisfactory. So far, 52 locomotives have been modified. 12 Locos are pending for replacement by D709.
iii Failures of PEC800 cards There had been 11 cases of PEC 800 cards during 14-15. Firm indicated that DOS file management system has been replaced with Reliance system and implemented in s/w version 35a11. So far updated in 69 locos. Balance locos provided with s/w version 36. Railways to monitor the performance.
iv Breakage of cover support guide Replacement of hardened steel dowel pins with Stainless Steel pins. To be completed by 31.05.15 as per MOM of TKD. Completed in 30 locomotives only. Pins given to sheds for replacement.
v Replacement of voltage sensor by LEM make ABB make voltage sensors are to be replaced by LEM make. 3 locos are left for replacement.
2 Software Issues
i Implementation of DDS message in DIA card of VCU DDS implementation trial is going on in 6 locos at different sheds for traction converter only. Loco no 31611(TKD) has been provided with DDS implementation in SR and BUR. ABB to provide modified s/w version 36 in 3 locos at TKD (31545,30396, 30397) and 4 locos at BIA (30385, 30387, 31401, 31539) to monitor the performance for regular release of s/w ver.36.
ii Time out initialization/time out release shut down To be implemented in new software version. Issue to be resolved.ABB has captured data, analysis to be done.
iii Regenerative braking issue during first instant To be implemented in new software version. Implemented in Loco 31545 (TKD) and 30385 (BIA).
iv Time mismatch between converter & VCU Resolved in version 36.Under trial in TKD and BIA. Railways to monitor performance and give feedback to RDSO/CLW.
v LC Over-current (both bogie getting isolated) Resolved in version 36.Under trial in TKD and BIA. Railways to monitor performance and give feedback to RDSO/CLW.
vi FLG-1 is not in service, change over to FLG-2 To be studied in detail.
vii Initialization time to be reduced to less than 50 seconds Node 504 achieved in 60 seconds with modified PEC board on loco number 31471 at TKD and to be further reduced by 10 sec in second phase.
viii Individual TM isolation on account of faulty speed sensor not possible Resolved in s/w version 36. 7 locos have been modified in TKD and BIA. No problem experienced so far.
ix Converter redundancy demonstration for current measurement and DC link voltage measurement Demonstrated in AQ with Version 35 A11.Under observation. Completed in 68 locomotives.
x No Single point data down loading for traction converter and auxiliary converter ABB to upload modified s/w version 36 in 07 locos and monitor the performance.
xi Unwanted Events Resolved in version 36 except Invalid ID. Under trial in TKD and BIA.
xii In case of Individual TM failure on line, there is no defined cause on driver display Resolved in version 36.Under trial in TKD and BIA.
xiii Different software required with different make BUR Pending
xiv Sometimes message FLG1:0096 SS04 harmonic filter appear and filter cubicle isolate from service Resolved in version 36.Under trial in TKD and BIA.
xv Inspection and maintenance related issues Stocking done at Nagpur, Delhi, Bangalore. Sheds to give feedback.
3 Miscellaneous
i While removing traction converter for any reason, TC to TC OFC is required to be removed by cutting connector. Firm to examine and suggests remedial measures Pending
ii Repair manual according to DDS Not yet submitted.
i While removing traction converter for any reason, TC to TC OFC is required to be removed by cutting connector. Firm to examine and suggests remedial measures Pending
BHEL
1 Hardware Issues
i Failure of IGBT Power Module Root cause of failures of power modules to be ascertained. SEPL error to be analyzed by Sept. end. BHEL to use Hitachi/Mitsubishi devices in place of ABB devices.
ii Coolant leakage problem Leakage in SR having cooling circuit with threaded joints. RDSO advised BHEL for using flanged coupling on trial basis in 10 locos. Performance found satisfactory. Same system to be adopted in all new as well as in service converters by BHEL.
iii Coolant level fluctuation BHEL to provide air vent in locos where air trap problem has been reported.
iv Coolant pressure switch failures BHEl to use Honeywell make pressure switches on 5 locos at KYN shed and Danfoss make on 5 locos in LGD shed and monitor performance.
v High failure of DCU card in SR. 3 failures occurred in 2015-16. BHEL to submit detailed report to RDSO/CLW.
vi ACI card failure in AUX. converter. Increase in failures of ACI cards in Aux. Converters. Firm has improved FPGA software to prevent boot loader error. BHEL to submit field performance of modified s/w ver. 985 to RDSO/CLW.
2 Software Issues
i ASC pulsing stop. Problem has been reported with modified software in LGD shed. BHEL to find out root cause by 30.09.15. Performance of s/w ver. 366 to be watched before implementing in other locos.
ii Tripping of Aux. converter due to TFP oil pressure low BHEL to provide s/w ver. 985 in 1 loco at CLW during commissioning for its efficacy.
iii Healthiness of Battery charger Message of Battery charger not working does not appear until battery voltage falls to 92 volts. S/w ver. 985 has been uploaded in one loco ar RPM. BHEL to submit field performance report to RDSO/CLW.
3 Other Issues
i Availability of Spare Parts & maintenance Stocking has been done at three sheds having major population, lallaguda, kalyan and bhillai. Sheds to confirm the adequacy of spares.
ii Commissioning failure Commissioning failure still very high. 21 failures per 100 equipment commissioned at CLW during 2014-15.

Link: click here

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

4566740 ★★★ 132SCoR~
5003683 ★★★ 58guest
2094741 ★★★ 144~
5187671 ★★★ 150Jordan~
5595577 ★★ 29RoyalIndianRailway...
5534738 ★★ 22jishnuthakur12301^...
4948161 ★★★ 41SCoR~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy