There is a road under bridge between Andal station and yard which limits the number of tracks passing over it. In order to increase platform length railways has to demolish the whole bridge. State government objected to it unless a viable alternative is made available cause that's the only road connecting point of north and south in the town and Kazi Nazrul Islam airport on continuation.