* "As per the timetable, introduction of every train and every stoppage into the system is justified by operational need on a clean slate—hence zero-based." It is good step. Operational need is something internal to IR. IR need to be extrovert and fix stoppages based on traffic demand.
* In the recent years, good steps had been taken like giving stoppage to CR rajdhani at Jalgaon which have more traffic potential instead of the traditional stop i.e. divisional HQ Bhusawal