There seems to be lot of confusion with regard to introduction of new train to Vasco via Shravanabelagola.According to me, the existing train to Kannur will continue to run as usual via., Shravanabelagola for 4 days and via Mysore for 3 days. If my assumption is true, will it be OK to have two back to back trains within a gap of 1.15 Minutes on 4 days and around 2.30 Hours on 3 days. Instead, the Kannur train may be made to leave SBC around 9.30 or 10 PM.