Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Jul 19 03:32:16 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 4576609
Posted: Feb 25 2020 (20:17)

3 Responses
Last Response: Feb 26 2020 (14:31)
Info Update
37714 views
7

Feb 25 2020 (20:17)   STP/Sitapur Junction (6 PFs)
shuk^~
shuk^~   4247 blog posts
Entry# 4576609            Tags  
#ElectrificationUpdate #25February2020
DAL/DaliGanj Junction - STP/Sitapur Junction electrification update
CRS inspection from DAL/DaliGanj Junction has started at 10:30AM with 10 coaches train which was hauled by GD WDM3A 14061R diesel loco. After departing from DAL/DaliGanj Junction CRS special train reached SD/Sidhauli where light snacks was arranged but team didn't had due to time constrain and moved to KMP/Kamlapur where lunch was served. After lunch inspection convoy moved towards STP/Sitapur Junction and reached around 05:30PM. After inspecting RE at STP/Sitapur Junction for around 1 hour inspection train departed STP/Sitapur Junction around 06:30PM for
...
more...
speed trial which was hauled by GD WAP4 22263.
DAL/DaliGanj Junction - STP/Sitapur Junction track is 140Km/hr capable however trial speed was conducted at 110Km/hr speed and most probably permission is expected as 110Km/hr.
More information awaits.

Translate to English
Translate to Hindi

5750 views
1

Feb 25 2020 (22:13)guest
Re# 4576609-1              
Phle WAG-7 se hone wala tha lekin WAP-4 se hua.
❤ for GD Shed Loco
Translate to English
Translate to Hindi

6166 views
0

Feb 25 2020 (23:24)
harshit~
harshit~   1033 blog posts
Re# 4576609-2               Past Edits
Trial was conducted at 115kmph I think..How much time it took from STP to DAL..
Translate to English
Translate to Hindi

5854 views
1

Feb 26 2020 (14:31)
shuk^~
shuk^~   4247 blog posts
Re# 4576609-3              
As per the news paper inspection train covered 82Km stretch in 55min that means max speed was 90Km/hr only however as per inspection team speed was around 110Km/hr and in some stretch speed was 115Km/hr.
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy