Late: 1h 43m late
@ BGTA/Bagratawa
Stopped
Single line ahead
Late: 2h 0m late
BGTA/Bagratawa 3.8 km<--->2.2 km SQL/Sontalai
Tunnel Crossed
Late: 2h 2m late
SQL/Sontalai 2.1 km<--->6.7 km GRO/Gurra
18 kms more
Arrived Itarsi at 16:57 and boarded GT at 17:15
TRIP HAS ENDED.
Reached Habibganj at 19:00 .
Patna to Bhopal, journey completed in 21 hrs