Valsad New Platform Construction started earlier in 2015 took 4 years and finally got operational from 14/01/2019.
BL WAG-5 23424 with 09072 Valsad Vapi Passenger was the first train to depart from New Platform No - 4.
22910 Puri Valsad Rake was Stabled on Pf#5.
69141 Virar Sanjan Surat Memu which was daily made to wait at Valsad outer got regularized on Pf#1.
The...
more... Curve from Pf#4 to Main Down line is Scenic.
BRC WAP-5 30065 with 11104 Bandra Jhansi Superfast also Overtook 69141 at Valsad.
RPF found something Suspicious that attracted thier attention towards the same.
Roughly it took 10 mins to get onto Mainline from Pf#4.
However this new Platforms has lower down the congestion at Valsad Railway Station and made train flow more smooth.