Blog Entry# 3969864
Posted: Nov 03 2018 (20:27)
3 Responses
Last Response: Nov 03 2018 (20:56)
Enroute Araku Valley, our 58501 VSKP - KRDL Passenger entered at Mallividu and then waited there for almost 15 mins for a crossing with a goods train going towards Vizag. 1st two pictures have been taken from the Vistadome (AC tourist) coach.
.
[Update: The route in between Kottavalasa and Mallividu is electrified double line and fully functional. In fact, our train went through the newly laid track upto Mallividu. The single electrified line continues from there, and doubling work is going on upto Shrungavarapukota (popularly called as S Kota).]
....
more...
Date: Oct 13, 2018.
Onek din baad e online holen dada?