As per SWR targets they need to commission Minchinal Bijapur Wandal stretch within Feb 2019 which can be seen as per pace of their speed here and even I saw some trucks loaded with rail tracks standing at Gadag outer towards Bijapur side but I am not sure those tracks are for Gadag Hotgi doubling or for Gadag Hubli doubling.And also new ROB is under construction at Hombal gate where Gadag Bijapur line bifurcates from Gadag Hubli Line.