Trains like Mahamana, Garib Rath, both Saharsa and BSB one, and many other trains constantly touch 110 mark.
Even in one of my previous blog, it was found running at 108 kmph
So that's not surprising.
The track upgradation is done in SPN-AMG stretch so the tracks are 110 fit.