There were 2 subways under construction. One after kattur and one near Lalgudi so the train had to go slow at both these locations. I did not have my speedometer on at that time, but I am pretty sure that the train went 45+ in the Kaveri river and before entering SRGM. But from GOC outer to TPJ the train was crawling