NR LHB rakes
Front EOG NCR
GD Groom ready with the bride for departure from PF-1 which departed at 11:45 delayed by MoSR itself due to inaugration of Escalators and other ameneties.
Due to this delay the front road crossing was closed for 45 mins. and 6 trains were looped due to this... at BSB,BCY,KMDR and Yusufpur.😂😂😂😂😂😂😂
Do...
more... enjoy First Class Ghazipur City railway station with 3rd dedicated LHB train, in a row. More to go in future.
Rake arrived with Hanumanji Livery KTE WDG 3A
do enjoy the full blog now....
®bruce